Client Name:
Year:

  • Mirfa Independent Water & Power Plan

    Topographic and bathymetric survey. Geotechnical works including borehole drilling, CPT and piezometer installation. Field, laboratory and geophysical tests including electrical resistivity, thermal resistivity, down-hole seismic tests, pressure-meter tests, plate bearing permeability tests and packer tests.

    Location: Abu Dhabi
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/a2_0.jpg
    Hyundai Engineering
    2015
  • Jebel Ali Container Terminal 4 Quay Wall Works Phase 1B & 2

    Offshore Geotechnical Investigations consisting of borehole drilling and field testing.

    Location: Abu Dhabi
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/a4.jpg
    BAM International
    2014
  • ADCO - Al Aabb'iya ASR Gas Development

    Onshore & offshore geotechnical, topographical survey, bathymetry survey and offshore geophysical investigations.

    Location: Abu Dhabi
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/a3.jpg
    Technip
    2014
  • Zayed City

    Geotechnical Investigations including  borehole drilling, CPTs, piezometers, trial pits, plate load tests, constant and falling head permeability and packer permeability.

    Location: Abu Dhabi
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/a5.jpg
    Dar Al Handasah Zayed City
    2014
  • Saadyat Island Development

    Geotechnical investigation including land and marine borehole drilling, topographic surveying, establishing independent on-site quality assurance laboratories for a period of four years in addition to materials testing for various construction projects.

    Location: Abu Dhabi
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/saadyet-island.jpg
    Tourism Development & Investment Co.(TDIC)
    2011
  • Abu Dhabi International Airport Expansion

    Topographical survery, geotechnical investigation including drilling hundreds of boreholes, completion of a variety of specialized field and laboratory tests and completion of hydrological and geophysical surveys.

    Location: Abu Dhabi.
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/abu-dhabi-airport.jpg
    Scadia and M/S Parsons International
    2010
  • Yas Island Development Project

    Geotechnical investigation of the state of the art Formula One Yas Marina Circuit and all hotels on the island, establishing site laboratories for quality control of concrete, asphalt, earthworks, metals and steel, post tensioning works, pile testing and non destructive testing of concrete.

    Location: Abu Dhabi
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/yas-island-development-project.jpg
    ALDAR Properties
    2010
  • Khalifa Port and Industrial Zone (KPIZ)

    Topographic survey, geotechnical investigation including drilling hundreds of boreholes, CPT’s, trial pits, groundwater monitoring & intensive field and laboratory testing in addition to environmental baseline study of the entire project area.

    Location: Abu Dhabi
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/ports.jpg
    Abu Dhabi Ports Authorities (ADPA) and HPA/Halcrow
    2007
  • Al Raha Beach Development

    Geotechnical investigation including offshore and onshore borehole drilling, topographical surveying, environmental testing, pile integrity testing, in addition to a wide range of field and laboratory tests on concrete, soils, aggregates and other materials used in the construction.

    Location: Abu Dhabi.
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/al-raha-beach.jpg
    Aldar Properties
    2006
  • Landmark Tower

    Geotechnical investigation including deep borehole drilling, pressuremeter testing and other intensive field and laboratory testing. 

    Location: Abu Dhabi
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/landmark-tower.jpg
    EC Harris International LTD
    2005
  • Sheikh Zayed Bridge of Abu Dhabi Island

    Land and marine geotechnical investigation including borehole drilling, pressuremeter testing and other field and laboratory testing.

    Location: Abu Dhabi.
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/sheikh-zayer-bridge.jpg
    Archirodon Construction (Overseas) Co
    2003
  • Emirates Palace Hotel

    On-shore and off-shore geotechnical investigation including drilling of boreholes, CPT’s and intensive field and laboratory testing.

    Location: Abu Dhabi.
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Palace-Hotel%2C-Abu-Dhabi.jpg
    KEO/TURNER/ HALCROW consultants
    2001
  • Sheikh Zayed Grand Mosque

    Geotechnical investigation consisted of deep boreholes, pressure meter testing and intensive field and laboratory testing.

    Location: Abu Dhabi.
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/sheikh_zaied.jpg
    Impregilo
    1996
  • Museum of the Future

    Borehole drilling, cone penetration testing (CPT), trial pit excavation, geophysical logging, field testing including packer and pressure-meter testing.

    Location: Dubai
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/zzzzzx.jpg
    Meraas Development
    2015
  • Blue Water Dubai

    Site investigation including drilling of 90 boreholes, field testing and laboratory testing. 

    Location: Dubai
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/xcxx.jpg
    Meeras Holding
    2014
  • Jumeirah Open Beach

    Geotechnical investigation including borehole drilling using two “ Jacked-up” pontoons, with related laboratory tests.

    Location: Dubai
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/A6.jpg
    Meeras Holding
    2014
  • Dubai Creek Crossing-Seventh Crossing Corridor Al Itihad Bridge

    Geotechnical work including land and marine boreholes and cross hole seismic testing.

    Location: Dubai
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/a7.jpg
    RTA
    2014
  • Dubai International Airport Expansion

    Installation of 4 data loggers for long term monitoring of strains and temperature of massive raft foundation at Dubai International Airport. Installation of strain gauges was carried out during several stages of raft construction.

    Location: Dubai
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/dubia-international-airport.jpg
    Dubai Civil Aviation
    2011
  • Jumeirah Garden City

    Geotechnical investigation including drilling of deep boreholes, performing specialized in situ tests, laboratory testing and interpretative geotechnical reporting.

    Location: Dubai
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/jumirah_garden_city.jpg
    Meraas Development and WSP Middle East
    2008
  • Proposed Arabian Canal Project

    Geotechnical investigation including drilling of geotechnical borings, down hole geophysics, and hydro geological investigations with double packers and infiltration tests in trial pits.

    Location: Dubai
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Arabian%20Canal%20Projct.jpg
    Limitless
    2007
  • Dubai Metro (Red and Green Line)

    Geotechnical drilling of several boreholes, performing specialized in situ tests, laboratory testing, and electrical resistivity testing.

    Location: Dubai
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/dubai-metro.jpg
    JT Metro / M/S. RTA
    2007
  • Palm Jumeirah and Palm Jabel Ali

    Geotechnical investigation, in situ testing including CPTU, SPT and plate bearing tests, geophysical testing including crosshole seismic study, construction material tests including pile testing and zone loading with real time settlement monitoring.

    Location: Dubai
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/plam-jumeirah.jpg
    Nakheel PJSC
    2004
  • Burj Khalifa

    Geotechnical investigation including borehole drilling, in situ testing including Elastometer testing, piezometer installation, geophysical testing including verticality survey and Cross-hole P and S tomography, in addition to routine and specialized testing for the soil, rock and groundwater sampling.

    Location: Dubai
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/borj-khalifa.jpg
    Emaar Properties
    2003
  • The Jetty Dining- Katara Village

    Near shore Geotechnical investigation including borehole drilling, and extensive field and laboratory testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/a9.jpg
    Katara Projects
    2015
  • Lusail Light Railway (LRT)

    Quality control and material testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/W1.jpg
    QDVC
    2015
  • Abraj Quartier Tower AQ-07 and Town Houses - The Pearl Qatar

    Quality Control & Materials Testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/4_0.jpg
    Qatari Arabian Construction Co. (QACC)
    2015
  • Al Khor Stadium

    Geotechnical works.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/1.jpg
    Dar Al-Handasah Shair & Partners
    2015
  • Al Rayyan Stadium - Energy Center Building

    Geotechnical works.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/01.jpg
    ECG Engineering Consultants Group S.A- QATAR
    2015
  • Doha Expressway Package 12 - F Ring Road

    Quality Control & Materials Testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/2.png
    CCC/ TCC Joint Venture
    2015
  • Al Rayyan Road Phase 1

    Quality control and material testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/D2.jpg
    Six Construct Boom Construction JV
    2014
  • New Port Project - NPP0032

    Quality control and material testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/S3.jpg
    Hamad Bin Khalid Contracting Company W.L.L (HBK)
    2014
  • Al Wakrah Stadium

    Quality control and material testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/2.jpg
    Hamad Bin Khalid Contracting Company W.L.L (HBK)
    2014
  • Doha Festival City 7500 - Energy Centre

    Materials Testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/4.jpg
    INTERNATIONAL TRADING & CONTRACTING CO. (ITCC)
    2014
  • Khalifa International Stadium

    Quality control, material testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/3.jpg
    MIDMAC- SIX CONSTRUCT JV.
    2014
  • Doha Metro Project - Red Line North Underground

    Materials Testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/5_0.jpg
    JACOBS International
    2013
  • QEZ3 New Port Project - Package/0035

    Quality control and material testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/S11.jpg
    Hyundai Engineering & Construction Co. LTD
    2013
  • Banana Island

    Quality Control & Materials Testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/3_0.jpg
    QACC / AMANA JV
    2013
  • MSHEIREB DOWNTOWN DOHA PHASE 3

    Quality control and material testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/8.jpg
    OBAYASHI - HBK-JV
    2013
  • Qatar Integrated Railway Project - Metro Phase 1 - Major Stations

    Quality control and material testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/6.jpg
    SAMSUNG-OHL-QBC Joint Venture
    2013
  • Barwa City

    Geotechnical investigation, field testing, pile testing and material testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/barwa-city-1.jpg
    Bilfinger Berger and United Precast Concrete
    2011
  • Barwa Commercial Avenue

    Material testing in addition to establishing and fully furnishing site laboratories for asphalt, concrete and soil testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/barwa-commercial.jpg
    HOCHTIEF Solutions Middle East Qatar W.L.L withh AECOM.
    2011
  • The Pearl Qatar

    Material testing, soil testing, in-situ field tests and pile tests with a fully equipped site laboratory.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/The-Pearl-Qatar.jpg
    Multiple clients
    2011
  • The State Mosque (Imam Muhammad Ibn Abdul Wahhab Masjid – Doha)

    Testing of Concrete & Soil.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/1_1.jpg
    Contraco Engg. Works
    2010
  • Museum of Islamic Art

    Geotechnical investigation, field testing, and material testing.

    Location: Doha
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/museum-if-islamic-art.jpg
    I.M. Pei
    2008
  • Muscat Wave

    Geotechnical investigation including borehole drilling, cone penetration testing (CPT), installation of Piezometers and routine laboratory testing.

    Location: Muscat
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/1_0.jpg
    The Wave Muscat
    2014
  • Sohar Port

    Concrete coring, and performing UPV, Covermeter, and Concrete Testing of Structure elements
     

    Location: Muscat
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/a15.jpg
    National Marine Services
    2014
  • Bathinah Express way Package-IV

    Geotechnical investigation including borehole drilling, installation of piezometers and routine laboratory testing.

    Location: Muscat
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/ccxcccc.jpg
    Ministry of Roads& Transports
    2014
  • Wadi Dayyqah Dam

    Geotechnical investigation including borehole drilling, performing various In situ tests, installation of piezometers in 21 locations to a maximum depth of 50m.

    Location: Muscat
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/000000000000000000000.jpg
    Ministry of Regional Municipalities &Water Resources
    2013
  • Sarayabander Jissah hotel

    Borehole drilling, collecting disturbed & undisturbed samples, performing various In situ tests, installation of piezometers, performing geological mapping and perfroming geophysical surveys using MASW.

    Location: Muscat
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/cccccccccccccccccccccccccccccccc_0.jpg
    Saraya Bander Jissah Oman
    2013
  • Duqm port Roads & Infrastructures

    Drilling up of 426 boreholes, performing various in situ tests, installation of piezometers and routine laboratory testing.

    Location: Muscat
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/vvvvvvv.jpg
    Ministry of Roads& Transports
    2013
  • Darsait - Wadikabir Road

    Site investigation and laboratory works.

    Location: Muscat
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/2121212.jpg
    Ministry of Roads& Transports
    2013
  • Bulk Jetty Structural Instrumentation Works

    Full pile testing scope including dynamic load tests (High Strain) during pile driving, static pile load tests (axial compression) and instrumentation of the pile shaft by strain gauges and inclinometers, and lateral pile load tests. Additionally, ACES developed special shaft instrumentation techniques to protect the instruments during pile driving.

    Location: Muscat
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Bulk%20Jetty%20Structural%20Works.jpg
    Sohar Port Authority and Royal Haskoning
    2011
  • SUR IPP

    Geotechnical investigation including borehole drilling, test pit excavation,geophysical surveying and field testing including plate load tests, pressuremeter tests and packer permeability tests.

    Location: Muscat
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Sur%20IIP.jpg
    Daewoo E&C and Marubeni Corporation
    2011
  • Oman Botanic Garden

    ACES-Muscat has been awarded the construction material testing and Quality Control works for the prestigious Oman Botanic Garden Phase IV Project.

    Location: Muscat
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Botanic%20GArden.jpg
    Diman Royal Court / Muscat Municipality and Bovis Lend Lease
    2011
  • UAE University New Campus

    Geotechnical investigation including borehole drilling and sampling in addition to extensive and laboratory material testing for Development Contract Package 2.

    Location: Al-Ain
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/university-capmpus_0.jpg
    Cansult Maunsell and Mubadala Development Company
    2007
  • Shaikha Salama Mosque Al-Ain

    Geotechnical investigation including borehole drilling and sampling in addition to extensive and laboratory material testing.

    Location: Al-Ain
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/shaikha-salama-mosque-al-ain_0.jpg
    APG Architechture & Planning Group and Al Dar Properties
    2007
  • Al-Ain Dubai Road

    Geotechnical investigation including borehole drilling and sampling in addition to extensive and laboratory material testing.

    Location: Al-Ain
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/al-ain-dubai-road_0.jpg
    HYDER Consulting (ME) Ltd.
    2006
  • Riyadh Metro

    Geotechnical investigation, cavity probing rock level detection and rock fracture grouting. Geotechnical investigation works consisted of borehole drilling, field testing including SPT and Packer, as well as laboratory testing. 

    Location: Riyadh
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/4_2.jpg
    Fast Consortium
    2014
  • Princess Noura University

    Geotechnical Investigation including filed testing and cavity grouting works, a complete range of material testing including concrete, steel, soil and asphalt and establishing site laboratories for the quality control of all construction works.

    Location: Riyadh
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Princess-Noura.gif
    Dar Al-Handasah and SBG
    2009
  • King Abdullah Financial District

    Geotechnical Investigation including filed testing and cavity probing works for over 30 tower locations, a complete range of material testing including concrete, steel, soil and asphalt and establishing site laboratories for the quality control of all construction works.

    Location: Riyadh
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/King%20Abdallah%20Financial%20Center.JPG
    Saudi Binladen Group (SBG)
    2009
  • Briman Strategic Water Reservoir Design & Build Project

    Geotechnical investigation, laboratory testing and quality control testing.

    Location: Jeddah
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/1_2.jpg
    Al Muhaidib Contracting Co. & Vinci Construction UK Ltd
    2015
  • Jeddah Metro

    Drilling a total of 150 boreholes to depths ranging from 10 to 45 meters below existing ground surface, installation of piezometers, and performing field and laboratory tests.

    Location: Jeddah
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/2_0.jpg
    Jeddah Metro Company (JMC)
    2015
  • Saudi Land Bridge Railway

    Borehole drilling, trial pit excavation, cone penetration tests (CPTs), seismic refraction survey, down hole seismic testing and laboratory testing on soil and rock samples.

    Location: Jeddah
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/3_1.jpg
    SAR
    2014
  • Yanbu Commercial Seaport

    ((2011-2012))

    Geotechnical investigation including drilling of boreholes and conducting routine, specialized laboratory testing. CPT

    Location: Jeddah
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/yanua.jpg
    Advance Construction Co., Menard and Huta HegerfeldSaudia Ltd.
    2011
  • King Abdullah Economic City (KAEC)

    Geotechnical investigation including drilling of 144 boreholes, field testing, quality control and other laboratory testing.

    Location: Jeddah
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/king-abdulla-economic-city.jpg
    Saudi Bin-Laden (PBAD)
    2011
  • Jeddah Islamic Seaport

    Geotechnical investigation including drilling of more than 50 boreholes and conducting routine and specialized laboratory testing.

    Location: Jeddah
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/jeddah-islamic-sea-port-2.jpg
    ASAS Co. KINDASA, Technical United Co. Saudi Spectrum Engineering Construction Co.
    2010
  • DOKAAE Projects (Development of King Abdul Aziz Endowment)

    Geotechnical investigation including drilling of boreholes, installation of piezometers, field permeability testing and other material lab testing.

    Location: Jeddah
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/dokaae-king-abdul-aziz.jpg
    Saudi Bin-Laden Group (ABCD)
    2009
  • Kingdom Tower Project

    Geotechnical Investigation

    Location: Jeddah
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/maxresdefault.jpg
    Emaar
    2009
  • Al Haramain High Speed Railway

    (2008-2011)Geotechnical investigation including drilling of 250 boreholes, conducting field testsincludingfalling head permeability, SPT, installation of standpipe piezometersand conducting soil and material laboratory testing.

    Location: Jeddah
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/haramain.JPG
    Al Arrab and Al Rajhi Contracting Company
    2008
  • Medical Colleges at King Faisal University, Al-Ahsa

    Geotechnical Investigation and laboratory testing.

    Location: Khobar
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/7.jpg
    Dar Al Omran
    2015
  • Umm Wu’al Phosphate- Turaif

    Geotechnical investigation including borehole drilling, related laboratory and chemical testing.

    Location: Khobar
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/a11.jpg
    SNC Lavalin Arabia LLC (SNCL).
    2014
  • Dammam North & South House Project (infrastructure

    Construction material and quality control testing.

    Location: Khobar
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/10.jpg
    Al-Yamama Company For Trading & Contracting; MAPA for Construction & Trading Co. INC
    2013
  • Al Marina Development Dammam Project

    Quality control.

    Location: Khobar
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/zz1.jpg
    Al-Rajhi Contracting Company
    2012
  • Jordan Nuclear Power Plant Project

    Site Investigation including borehole drilling, field testing, borehole geophysics and laboratory testing.
     

    Location: Amman
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/1_3.jpg
    Dar Al-Handasah & KEPCO E&C
    2015
  • Existing Dikes- Dead Sea

    Geotechnical investigation including borehole drilling, CPTs and field tests including vane share and plate dilatometer.

    Location: Amman
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/as8.jpg
    Arab Potash Company
    2015
  • Jordan Research & Training reactor

    Site Investigation including borehole drilling, field testing, borehole geophysics and laboratory testing.

    Location: Amman
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/44444.png
    DAEWOO Engineering & Construction Co.
    2012
  • Hilton Dead Sea

    Site Investigation.

    Location: Amman
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/2_1.jpg
    Emaar
    2012
  • Najwa Wadi Ram Resort

    Drilling of eighteen boreholes, obtaining seventeen core samples in mountains locations using portable core machine, excavating of five test pits, performing several field and laboratory testing, carrying out geological, geophysical and hydrological studies and preparing interpretative geotechnical reporting.

    Location: Amman
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Najwa.jpg
    Al-Najwa Tourism Investment Co.
    2011
  • Queen Alia Airport

    Site Investigation and material testing.

    Location: Amman
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/4_1.jpg
    W J&P National Wheel J&P L.L.C
    2007
  • Al Abdali Development

    Site investigation and geotechnical evaluation including drilling of hundreds of boreholes for several prestigious projects including Saraya Al Abdali Tower, Kawar building, Rotana Hotel Tower, Damac Tower and others. Extensive field testing including permeability testing, pressmeter testing, piezometers installation and geophysical surveying were conducted throughout the investigations. ACES also set up quality control site labs at several of the above mentioned projects.

    Location: Amman
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Abdali.jpg
    Saraya Development Group & Others
    2007
  • Taj Mall

    A comprehensive geotechnical investigation including drilling of fifty nine boreholes, field and laboratory testing, and interpretive geotechnical reporting. Additionally, site laboratories were established for quality control testing during construction

    Location: Amman
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/taj.jpg
    Arabtech Jerdanah
    2006
  • King's Academy

    ACES Amman completed the geotechnical investigation, quality control and material testing for the King’s Academy in Madaba, Jordan. The academy is a unique education institution that works under the direct patronage of His Majesty King Abdullah II.

    Location: Amman
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/kings%20academy.jpg
    The Royal Court
    2005
  • King Abdullah University Hospital

    ACES Amman established site laboratories and completed the quality control works and material testing during the construction of the King Abdallah University Hospital in Irbid, Jordan. The hospital is the largest medical structure in the north of Jordan, serving the approximately one million inhabitants in Irbid, Ajloun and Jerash.

    Location: Amman
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/king-abdullah-hospital.jpg
    2004
  • Al-Mujib Dam

    ACES Amman conducted the quality control works and material testing for the construction of the Al Mujib Dam.

    Location: Amman
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/al-mujib-dam_0.jpg
    AEGEK General Construction
    2000
  • Ayla Oasis

    Site investigation and geotechnical evaluation including drilling of more than 500 boreholes for several prestigious projects including Arabian Venice, the Island Apartments, the Fortress Hotel & lagoon projects among others. Additionally, ACES conducted geophysical surveys, field and laboratory testing, piezometer installation, materials testing and set up of quality control site labs.

    Location: Aqaba
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Ayla1.jpg
    Ayla Consultancy & Project management Co.
    2010
  • Tala Bay Resort

    Site investigation and geotechnical evaluation including drilling of hundreds of boreholes, conducting field and laboratory testing, installing piezometers, performing permeability testing, and performing hydrogeological investigation.
    Additionally, a full range of materials testing, and set up of site labs for quality control test were completed by ACES.

    Location: Aqaba
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Tala%20Bay.jpg
    Jordan Project for Tourism Developmen
    2006
  • Saraya Al Aqaba

    Site Investigation, quality control testing and laboratory testing.

    Location: Aqaba
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/4_3.jpg
    Saudi Oger
    2006
  • The Sudanese Eritrean Interconnection Transmission

    Borehole drilling and related laboratory testing 

    Location: Khartoum
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/a9_0.jpg
    The Sudanese Electricity Transmission Company
    2014
  • Structural Evaluation of Rosaries Bridge

    Visual inspection and documenting of the existing conditions and deficiencies in the bridge, assessing the magnitude of the damage in accordance with the Building Research Establishment (BRE) guide lines, obtaining (58) concrete cores from the main structural elements to evaluate the exiting concrete, detecting steel corrosion and determine carbonation depth in concrete and developing general conclusions regarding the present state of the bridge in addition to providing recommendations for the repoair work.

    Location: Khartoum
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Dam.JPG
    2010
  • Musheirab Development

    Geotechnical investigation including borehole drilling, field testing including SPT, Pressuremeter, Van shear and Permeability testing, in addition to test pit excavation and surveying.

    Location: Khartoum
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Mushreib.JPG
    2010
  • Al Sheraton Intersection

    Geotechnical investigation including borehole drilling, field testing, pile load and pile integrity testing, in addition to a range of construction material testing.

    Location: Sana'a
    http://aces-int.com/sites/default/files/imagecache/product_catalog_wide/projects/Sheraton%20Intersection.JPG
    Al-Saeed Co. for Manufacturing Concrete &Contracting (SMCC)
    2010