Are you interested in our services?

ACES Jeddah was awarded the QC and materials testing for two road projects: the first is Sari Street and King Fahd Road Intersection Bridge; and the second is Madina Road and Tahlia Street Intersection Tunnel. The total length of the intersection bridge is 800 meters and will include slopes and two tracks in each direction. The second project will involve the construction of a tunnel. The east-west underpass will have a total length of 650 meters, which will have two lanes in each direction of Tahlia Street.

ACES is responsible for quality control and materials testing for both projects. The materials testing includes soil, concrete, asphalt, and pile testing. Also, site laboratories from ACES will be present in both projects for routine materials testing.

The client for both projects isĀ Advanced Construction Co.

bridgepng.png