Are you interested in our services?

ACES Jeddah has been awarded the preliminary geotechnical investigation for NEOM’s The Line Viaducts Package. The Viaduct sections proposed locations are along The Line’s entire Neom Backbone alignment corridor, which crosses four major topographical zones and is approximately 160 km long.

 

The scope of work includes drilling and sampling of 46 boreholes to a maximum depth of 270m, performing geotechnical laboratory testing on soil & rock samples, and completing geophysical surveys.

 

The Client for this project is Khatib and Alami Saudi Consolidated Engineering Company.

 

site-photos-7.jpg